Defence Long-Term Development Plan (LTDP)
(October 2008 Update)
Contents
Preface by the Minister of Defence
2. The LTDP and Defence Policy
- Boeing 727 Replacement
- Defence Headquarters Building
- Medium Range Anti-Armour Weapon
- Very Low Level Air Defence Cueing System
- Light Operational Vehicles
- Multi-Role Vessel
- Improvised Explosive Device Disposal
6. Projects Approved and in Acquisition Phase
- Boeing 757 Modification
- Patrol Vessels
- Special Operations Capability
- P-3 Mission Management, Communication, and Navigation Systems Upgrades
- C-130 Life Extension
- NZDF Medium Utility Helicopter Capability
- Ohakea Essential Infrastructure Programme
- Ohakea Base Taxiways Reconstruction
- Replacement of Devonport Naval Base 60Hz Power Generation and Reticulation
- Replacement of Devonport Naval Base Fuel Installation Facilities
- C-130 Self-Protection
- ANZAC Class Close-In Weapon System Upgrade and Refurbishment
- NZDF Training/Light Utility Helicopter Capability
- Night Vision Equipment
7. Projects Approved In Principle by the Government
- Advanced Pilot Training Capability (B200 Replacement)
- ANZAC Class Platform Systems Upgrade
- Joint Command and Control System
- Ohakea Consolidation
- ANZAC Class Self-Defence Upgrade
8. Projects Critical to Avoid the Failure of Policy
- Joint Communications Modernisation
- Land Command & Control, Communications, Computers, Intelligence, Surveillance,
and Reconnaissance
9. Projects Essential to Avoid the Failure of Policy
10. Projects Necessary to Avoid the Failure of Policy
P-3 Air-to-Surface Weapons
11. Projects that have Benefit but are Less Critical to Achieving Policy Objectives
12. Projects Previously on the LTDP and Moved to the Defence Capital Programme - Minors

